State of the Remodel Address~


For those curious to know where we are and what the status is of our remodel, here is the complete rundown….

 Appliances

  • Refrigerator (LG French doors/bottom freezer in white) purchased.  Delivery in 2 weeks.
  • Dishwasher (Amana with silverware things in the door (in white) purchased.  Pick up this afternoon.
  • Microwave/Vent combo thingie  (LG in white) purchased.  Pick up whenever they find it.

To buy:

  • Rice steamer
  • Toaster Oven (Morgann toasted ours when she caught her toast on fire this week)
  • Meat Tenderizer  (Because once you’ve had this sandwich you’ll realize the investment is worth it!)

Kitchen

  • Floor- Purchased.  (Home Depot hand scraped bamboo flooring in “toast”.)  Arrives 1 week from Monday

To Do in Kitchen:

  • Get Plumbing estimate  (Wednesday February 20, 1:00 p.m. PST)
  • Schedule plumbing work & sign contract.
  • Have plumbing changes made
  • Replace Kitchen window
  • Replace Kitchen door
  • Fix drywall
  • Add beadboard
  • Install flooring
  • Buy cabinets
  • Install cabinets
  • Install countertop
  • Buy trim
  • Paint trim
  • Install trim
  • Install appliances
  • Put Kitchen stuff away

Bathroom:

  • Buy new flooring
  • Buy new sink
  • Buy new tub
  • Buy shower surround
  • Remove tub, sink, and toilet
  • Paint walls
  • Replace flooring
  • Replace tub and shower surround
  • Replace toilet
  • Replace sink
  • Install false wall in Nolan’s closet
  • Cut out current bathroom wall
  • Install shelving in cut out.
  • Install beadboard
  • Install chair rail and knobs
  • Install baseboards and door trims
  • Install new medicine cabinet/door
  • Install new light fixture

Door Project:

  • Buy doors 
  • Paint doors
  • Replace bathroom door 
  • Replace hall closet door
  • Replace living room closet door
  • Replace our bedroom door
  • Replace boys’ bedroom door
  • Replace girls’ bedroom door
  • Replace our closet door
  • Replace boys’ closet door
  • Buy new door for our bedroom, paint.  Again.

 

For those of you who are skeptics…

I’d write out the outside projects but that’s just discouraging!

Advertisements

One thought on “State of the Remodel Address~

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s