For those curious to know where we are and what the status is of our remodel, here is the complete rundown….
Appliances
-
Refrigerator (LG French doors/bottom freezer in white) purchased. Delivery in 2 weeks.
-
Dishwasher (Amana with silverware things in the door (in white) purchased. Pick up this afternoon. -
Microwave/Vent combo thingie (LG in white) purchased. Pick up whenever they find it.
To buy:
-
Rice steamer
-
Toaster Oven (Morgann toasted ours when she caught her toast on fire this week)
-
Meat Tenderizer (Because once you’ve had this sandwich you’ll realize the investment is worth it!)
Kitchen
-
Floor- Purchased. (Home Depot hand scraped bamboo flooring in “toast”.) Arrives 1 week from Monday
To Do in Kitchen:
-
Get Plumbing estimate (Wednesday February 20, 1:00 p.m. PST) -
Schedule plumbing work & sign contract.
-
Have plumbing changes made
-
Replace Kitchen window
-
Replace Kitchen door
-
Fix drywall
-
Add beadboard
-
Install flooring
-
Buy cabinets
-
Install cabinets
-
Install countertop
-
Buy trim
-
Paint trim
-
Install trim
-
Install appliances
-
Put Kitchen stuff away
Bathroom:
-
Buy new flooring
-
Buy new sink
-
Buy new tub
-
Buy shower surround
-
Remove tub, sink, and toilet
-
Paint walls
-
Replace flooring
-
Replace tub and shower surround
-
Replace toilet
-
Replace sink
-
Install false wall in Nolan’s closet
-
Cut out current bathroom wall
-
Install shelving in cut out.
-
Install beadboard
-
Install chair rail and knobs
-
Install baseboards and door trims
-
Install new medicine cabinet/door
-
Install new light fixture
Door Project:
-
Buy doors -
Paintdoors -
Replace bathroom door -
Replace hall closet door -
Replace living room closet door -
Replace our bedroom door
-
Replace boys’ bedroom door -
Replace girls’ bedroom door
-
Replace our closet door
-
Replace boys’ closet door
-
Buy new door for our bedroom, paint. Again.
For those of you who are skeptics…
I’d write out the outside projects but that’s just discouraging!