State of the Remodel Address~

For those curious to know where we are and what the status is of our remodel, here is the complete rundown….

 Appliances

  • Refrigerator (LG French doors/bottom freezer in white) purchased.  Delivery in 2 weeks.
  • Dishwasher (Amana with silverware things in the door (in white) purchased.  Pick up this afternoon.
  • Microwave/Vent combo thingie  (LG in white) purchased.  Pick up whenever they find it.

To buy:

  • Rice steamer
  • Toaster Oven (Morgann toasted ours when she caught her toast on fire this week)
  • Meat Tenderizer  (Because once you’ve had this sandwich you’ll realize the investment is worth it!)

Kitchen

  • Floor- Purchased.  (Home Depot hand scraped bamboo flooring in “toast”.)  Arrives 1 week from Monday

To Do in Kitchen:

  • Get Plumbing estimate  (Wednesday February 20, 1:00 p.m. PST)
  • Schedule plumbing work & sign contract.
  • Have plumbing changes made
  • Replace Kitchen window
  • Replace Kitchen door
  • Fix drywall
  • Add beadboard
  • Install flooring
  • Buy cabinets
  • Install cabinets
  • Install countertop
  • Buy trim
  • Paint trim
  • Install trim
  • Install appliances
  • Put Kitchen stuff away

Bathroom:

  • Buy new flooring
  • Buy new sink
  • Buy new tub
  • Buy shower surround
  • Remove tub, sink, and toilet
  • Paint walls
  • Replace flooring
  • Replace tub and shower surround
  • Replace toilet
  • Replace sink
  • Install false wall in Nolan’s closet
  • Cut out current bathroom wall
  • Install shelving in cut out.
  • Install beadboard
  • Install chair rail and knobs
  • Install baseboards and door trims
  • Install new medicine cabinet/door
  • Install new light fixture

Door Project:

  • Buy doors 
  • Paint doors
  • Replace bathroom door 
  • Replace hall closet door
  • Replace living room closet door
  • Replace our bedroom door
  • Replace boys’ bedroom door
  • Replace girls’ bedroom door
  • Replace our closet door
  • Replace boys’ closet door
  • Buy new door for our bedroom, paint.  Again.

 

For those of you who are skeptics…

I’d write out the outside projects but that’s just discouraging!